Phasing Plan
 

The following set of charts are listed in order of design and construction priorities developed to meet immediate needs and achieve the 2030 design. These priorities are based on projected population and traffic demand.

Priority 1 items should begin immediately and includes such activities as the improvement of intersections that are currently at Level of Service F (Ideally, all roadways should operate at Level of Service D or better). Priority 2 items should begin soon and include such items as improvement of intersections that may become Level of Service F within the near future.

Priorities 3-8 are based on traffic and population projections and may have to be reevaluated as more of the land is developed. By priority 6, all of the improvements necessary through 2030 are expected to be complete. Priorities 7 and 8 are broken up into a planning phase and a construction phase. The team expects these phases to be necessary by the time the Houghton Road corridor area is completely built out.

 

Priority 1*

Action Item

Location

Comments

Environmental Assessment & Design Concept Report (DCR)

Houghton Rd from Dawn Rd to Old Vail Rd

To include bridge selection reports for the I-10 overpass and UPRR overpass (accelerate the UPRR bridge selection)

Design/Construction

Houghton Rd & Irvington Rd
Craycroft Rd & Golf Links Rd
Kolb Rd & Golf Links Rd

Signalize the Irvington intersection

Design/Construction

UPRR Bridge

Bridge to be replaced with 6 lanes or allow for future twin structure

Traffic Studies

Kolb Rd & Golf Links Rd
Craycroft Rd & Golf Links Rd
Houghton Rd & Irvington Rd
Houghton Rd & Old Vail Rd
Houghton Rd & I-10 Ramps

Intersection studies (accelerate Irvington, Craycroft and Kolb studies)

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements

Right-of-Way Acquisition

Kolb Rd & Golf Links Rd
Craycroft Rd & Golf Links Rd
Houghton Rd & Irvington Rd
Houghton Rd & Old Vail Rd
UPRR Bridge area

Studies and Design Concept Reports to define specific right-of-way acquisition necessary

*Note: This work must be started immediately. Intersections noted for construction are currently at Level of Service F.

Priority 2

Action Item

Location

Comments

Additional Study

Area Arterial Study

Study roadway network north of I-10

Design/Construction

Houghton Rd & Old Vail Rd
Houghton Rd & I-10 Ramps

Signalize the three intersections with Houghton Road

Design/Construction

Houghton Rd & Speedway Blvd
Houghton Rd & Broadway Blvd
Houghton Rd & 22nd St
Houghton Rd & Escalante Rd
Houghton Rd & Drexel Rd
Houghton Rd & Valencia (northbound)

Add right turn lanes at all of these major intersections. Most of them are signalized.

EA & Design Concept Report (DCR)

Houghton Rd from Escalante Rd to Broadway Blvd

Traffic Studies

Houghton Rd & Broadway Blvd
Houghton Rd & 22nd St
Houghton Rd & Old Spanish Trail
Houghton Rd & Golf Links Rd
Houghton Rd & Escalante Rd

Intersection studies

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements

Right-of-Way Acquisition

Realigned Houghton Rd at I-10
Major Intersections from Escalante Rd to Broadway Blvd
Segment 1 Houghton Greenway

Studies and DCRs to define specific right-of-way acquisition necessary

Priority 3

Action Item

Location

Comments

Design/Construction

I-10 Interchange

To include structure to 6-lane width

Design/Construction

Roadway from Escalante Rd to Broadway Blvd
Roadway from Dawn Rd to Old Vail Rd

Roadways using 4-lane interim typical section

Environmental Assessments & Design Concept Reports

Houghton Rd from Old Vail Rd to Escalante Rd
Golf Links Rd from Harrison Rd to Houghton Rd
Golf Links/Alvernon/Aviation Interchange

To include bridge selection report for Pantano Wash bridge

Traffic Studies

Houghton Rd & Rita Rd
Houghton Rd & Valencia Rd
Houghton Rd & Poorman Rd
Houghton Rd & Drexel Rd

Intersection studies

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements

Right-of-Way Acquisition

Realigned Houghton Rd at Pantano Bridge
Major Intersections from Old Vail Rd to Escalante Rd
Golf Links/Alvernon/Aviation Interchange
Segment 2 Houghton Greenway

Design Concept Reports to define specific right-of-way acquisition necessary

Priority 4

Action Item

Location

Comments

Design/Construction

Pantano Wash Bridge and
Houghton Rd from Escalante Rd to Old Vail Rd

To include structure to 6-lane width and roadways using 4-lane interim typical section

Design/Construction

Interim Golf Links/ Alvernon/ Aviation Interchange
Golf Links Rd from Harrison Rd to Houghton Rd

Interim interchange improvements
Golf Links to be increased to 6 lanes

Environmental Assessment & Design Concept Report

Houghton Rd from Broadway Blvd to Tanque Verde Rd

To include bridge selection reports for Agua Caliente and Tanque Verde Wash bridges

Traffic Studies

Houghton Rd & Speedway Blvd
Houghton Rd & Tanque Verde Rd

Intersection studies

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements

Right-of-Way Acquisition

Realigned Houghton Rd at Agua Caliente and Tanque Verde Bridges
Major Intersections from Broadway Blvd to Tanque Verde Rd

Design Concept Reports to define specific right-of-way acquisition necessary

Priority 5

Action Item

Location

Comments

Design/Construction

Houghton Rd from I-10 to Old Spanish Trail

Including roadway using 6-lane 2030 typical section

Design/Construction

Houghton Rd from Old Spanish Trail to Tanque Verde Rd

Including twin bridge structures at Agua Caliente and Tanque Verde Wash crossings and roadway using 4-lane 2030 typical section

EA’s & DCR’s

Houghton Rd from Dawn Rd to Sahuarita Rd
I-10 Directional Ramp

To include bridge selection report for directional ramp

Traffic Studies

Houghton Rd & Sahuarita Rd
Houghton Rd & Sahuarita Corridor
Houghton Rd & Dawn Rd
Houghton Rd & Old Vail Rd
Houghton Rd & Valencia Rd

Intersection studies

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements

Right-of-Way Acquisition

I-10 Directional Ramp
Major Intersections from Sahuarita Rd to Dawn Rd
Segment 3 Houghton Greenway

Design Concept Reports to define specific right-of-way acquisition necessary

Priority 6 *

Action Item

Location

Comments

Design/Construction

Houghton Rd from Dawn Rd to Sahuarita Rd

Including roadway using 4-lane 2030 typical section

Design/Construction

Houghton Rd & Valencia Rd
Houghton Rd & Old Vail Rd

Grade-separated interchanges with single point urban interchanges

Design/Construction

NB Houghton Rd to WB I-10 Directional Ramp

Paving and bridge structure

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements

*Note: Completion of improvements through this priority meet projected 2030 corridor traffic projection needs.

Priority 7

Action Item

Location

Comments

Houghton Road Corridor Study

Houghton Rd from Sahuarita Rd to Tanque Verde Rd

Update this study

Environmental Assessment and Design Concept Report

Golf Links/Alvernon/Aviation Fully Directional Interchange

Including bridge selection reports and traffic reports

Environmental Assessments and Design Concept Reports

All segments on Houghton Rd from Sahuarita Rd to Tanque Verde Rd

Including bridge selection reports and traffic reports

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements.

Right-of-Way Acquisition

Golf Links/Alvernon/Aviation

Design Concept Report to define specific right-of-way acquisition necessary

Priority 8

Action Item

Location

Comments

Construction

Golf Links/Alvernon/Aviation

System Interchange

Construction

Houghton Rd & Valencia Rd and Houghton Rd & I-10

System interchanges

Construction

Houghton Rd & Old Spanish Trail and all mile intervals on Houghton Rd from Golf Links Rd to Sahuarita Rd

Grade-separated interchanges

Construction

Houghton Rd from Sahuarita Rd to I-10 and from Old Spanish Trail to Tanque Verde Rd

Widen to 6 lanes.

Traffic Impact Analyses

Adjacent to any new development

Require developers to participate in corridor improvements

 

 

 

 